
BMW 1 SERIES
120 M Sport
The 2025 BMW 1 Series is innovative, individual and intelligent. Enjoy an even richer experience thanks to modern technologies in the interior, including the combination of the standard BMW Curved Display.
Key Features
Climate Control
Heated Seats
Camera
Parking Sensors
Bluetooth
Cruise Control
Isofix Child Seat Mounts
Overview
Sun Protection Glass
Features
This fantastic BMW 120 M Sport comes fitted with
- Black Sapphire
- Veganza perforated Coral Red Black Upholstery
Specification
- Electric power steering with Servotronic steering optimised at all speed ranges
- Lane departure warning system
- Front and rear parking sensors
- Attentiveness assist
- Active guard plus
- Cruise control with speed limiter
- Park assist including reversing assistant, lateral parking aid and reversing assist camera
- Front axle single joint with specific axle kinematics to minimise drive influences on steering + provide increased rigidity agile driving behaviour
- Speed limit Info including no-overtaking indicator
- Speed limiter
- My modes (Personal / Efficient / Sport)
- Left turn warning with brake function
- Flat airvents in instrument panel with adjustable slats
- 0 to 62 mph (secs) : 7.8
- Top Speed : 140
- Engine Power - BHP : 156
- Engine Torque - NM : 280
- WLTP - CO2 (g/km) - Comb : 121
- WLTP - MPG - Comb : 52.3
- Bluetooth / WiFi interface for wireless connection of mobile terminal devices and audio streaming
- DAB Digital radio
- Eco pro mode
- Pull away assistant
- Evasion assistant
- Personal e-SIM
- Locking wheel bolts
- Side impact protection
- Seatbelt warning
- Cornering brake control
- Warning triangle and first aid kit
- Tyre pressure monitoring system
- Dynamic Traction Control - DTC
- BMW emergency call
- Brake drying
- Central locking switch for all doors, fuel filler cap and luggage compartment
- Front and rear disc brakes
- 2 tone horn
- Driver and front passenger seat belt security check
- Anti lock braking system (ABS) with brake assist
- Braking readiness
- Thatcham Cat.1 alarm and immobiliser
- 3 point seatbelts on all seats, front pyrotechnic belt tensioners, stopper and belt force limiters, rear coded belt buckles
- Child proof locking system in rear door
- Dynamic stability control + (DSC+)
- Airbags - Front driver/passenger, front and rear curtain head protection, front side, manual deactivation of front passenger airbag
- Deadlocking function system to all doors
- City braking function
- Remote control with integrated key with High-gloss Black inlay and M designation and 1 button for open/ close lock, window, open luggage compartment
- Crash sensor activating of airbags,Unlocking doors,hazard warning lights,fuel cut off,interior lighting+activation of safety battery terminal clamp
- Electrically operated hand brake including automatic hold function
- Drive away locking system on all doors and luggage compartment with de-activated in iDrive settings
- Wheel slip limitation close to the actuator (ARB)
- Start/stop button illuminated in centre console with keyless engine start and auto start stop deactivation button
- Comfort modes
- LED Headlights
- BMW mobility system
- M sport suspension
- Body colour door handles
- High level third brake light
- Anti roll bar front and rear
- Follow me home headlights
- Automatic headlight beam throw control
- Welcome lighting
- LED daytime running lights
- Drive Performance Control
- LED front fog lights
- Shark fin antenna
- Visible VIN plate
- Rear fog lights
- Front and rear bumper system with replaceable deformation elements
- Rear window wiper
- Reduced rolling resistance tyres
- Lightweight engineering
- Green tinted heat protection glazing
- Front and rear electric windows with open and close fingertip control, anti trap facility and comfort closing
- Direction indicator side lights in exterior mirrors
- Nearside reverse light in rear light cluster
- Chrome 'M' logo side designation
- Twin tube gas filled shock absorbers with degressive characteristic curve
- Body colour roof trims
- Fading support
- Matt black air guide grilles
- Chrome kidney grille frame with Satin Aluminium struts
- Front door sill finishers in black plastic with M designation in metallic look
- High gloss shadowline window frame, Recess cover mirror frames and B/C pillar embelisher trim
- LED eyebrow turn indicators
- Preparation for high beam assistant
- Automatic windscreen wipers and automatic headlight
- Integrated front windscreen with washer jets
- Electrically powered 12V compressor
- Chrome exhaust twin tailpipes round 90mm in left
- Matt black wheel arch trim
- Rear side wing doors
- Rain sensor
- Heated rear window
- Side sill covers with M specific design in body colour
- M identification on the sides
- Exterior M sport design elements
- High gloss black exterior mirrors
- Model badge on tailgate right
- Front bumper panel with M specific design in vehicle colour with inserts in black high gloss
- M Adaptive suspension
- Rear bumper panel with M-specific design in vehicle colour with inserts in black high gloss
- Alloys? : Yes
- Rear seat backrest with manual 60:40 split folding with 3 top tether clips integrated on rear of seat panels
- Height adjustable front head restraints
- 3 rear seat head restraints
- Anthracite headlining
- Manual adjust steering wheel
- Automatic dimming rear view mirror
- Glove compartment
- Front armrest
- Multi-function controls for steering wheel
- Folding rear clothes hook
- Storage compartment in luggage compartment
- Storage compartment in centre console
- 3 seat bench in 2nd row
- Front and rear door pockets with bottle holders
- Conditioned based service
- Velour floor mats
- Driver and front passenger seat heating
- Four grab handles integrated in roof lining
- Front and rear side armrest integrated into door trim
- Driver and front passenger backrest net on rear
- Child seat ISOFIX attachment for two outer rear seats and front passenger seat with anchorage points
- Contrast stitching on instrument panel
- Driver side folding compartment in instrument panel
- 12V power socket in front centre console with blanking plug
- Type C two USB ports in rear centre console
- Stowage of the parcel shelf in luggage compartment trim
- Folding side mirrors with auto dimming/folding wing mirrors with auto dimming
- 3 spoke sports leather steering wheel with black leather and stitching, pearl chrome decorative finish, specific M Badge
- Two front centre console cupholders
- Single front passenger seat
- Luggage compartment for bag hooks on left and right, foldable luggage compartment liner and four lashing eyelets
- Cargo function on 2nd seat row
- Black boot net with lashing eyes
- Electrically adjustable exterior mirror with mirror adjustment switch on drivers armrest and aspheric on driver side, convex on passenger side
- Gearshift paddles on steering wheel
- Front armrest with storage compartment
- Footrest and pedals in black plastic
- Anthracite front and rear floor mats
- Upper retaining strap integrated into backrest rear panels
- No. of Seats : 5
- Electronic differential lock
- Petrol Particulate Filter
- High precision injection
- Balancer shaft
- VALVETRONIC engine management
- Aluminium lightweight construction
- Double VANOS twin scroll turbocharging system
- Trailer stabilisation logic
- Steptronic transmission with double clutch
- Electronic selector lever
- 49 litre fuel tank
- Minimum Kerbweight : 1425
- Gross Vehicle Weight : 1990
- Fuel Tank Capacity (Litres) : 49
- Max. Towing Weight - Braked : 1300
- Max. Towing Weight - Unbraked : 750
- Luggage Capacity (Seats Up) : 300
- Tyre Size Spare : Tyre Repair Kit
- Transmission : Semi-Auto
- Wheel Style : Y-Spoke Style 975
- Insurance Group 1 - 50 Effective January 07 : 21E
- Service Interval Mileage : 18000
- NCAP Overall Rating - Effective February 09 : 5
- Interior lights pack - 1 Series
- Connected pack professional - 1 Series
- M Sport exterior styling aerodynamics pack - 1 Series
- Length : 4361
- Width (including mirrors) : 2072
- Height : 1459
The BMW Promise
In-Stock Immediate Delivery
In-stock and available to drive away today.
3 Years BMW Warranty
The BMW Three Year Unlimited Mileage Retailer Warranty gives you peace of mind for the first three years of your ownership.
BMW Roadside Assistance
It’s a reassuring feeling to know exactly who to turn to if the worst comes to the worst. With BMW Roadside Assistance, a BMW specialist is just one call away.
BMW Connected Drive
The digital products and connected services from BMW ConnectedDrive offer you a wide range of useful functions. Smart and innovative to make your life easier.
My BMW App
Check the status of your BMW, use one of the many remote control features, plan trips in advance, book your next service appointment, or discover the world of BMW – all from the convenience of your smartphone.
BMW Free-of-Charge 5 Day Drive-Away Insurance
BMW 5 Day DriveAway Car Insurance is a comprehensive policy. Once you activate it, you are covered from the moment you collect your BMW for 5 days.
Why Buy a New Vehicle from Lloyd?
The Full Package
We can offer you the full range of automotive services tailored to meet the requirements of your needs.
We’ve got History
With 45 years experience as a family owned independent business we pride ourselves on unique standards of service and attention detail.
Unique Showroom Experience
The experience of visiting our showrooms is second to none providing a relaxing environment for you to browse, configure and drive right out of the showroom.
Lloyd Recommends
At Lloyd Motor Group we aim to make driving a car as affordable as possible with finance offers and deals to suit every budget.
2025 (75) BMW 3 SERIES 330e 22.3 kWh M Sport 4dr Step Auto
"£500 Deposit Contribution"BMW M4 xDrive Competition M 2dr Step Auto
"Heated Seats & Steering Wheel!"2023 (23) BMW 1 SERIES 118i [136] M Sport 5dr [Live Cockpit Professional]
"M Sport Package, Park Sensors!"2020 (70) BMW 7 SERIES 740Ld xDrive M Sport 4dr Auto
"Lloyd Used Car Event Now On!"2023 (73) BMW 3 SERIES 320i M Sport 4dr Step Auto
"M Sport & M Sport Pro Packages"2025 (75) BMW X3 xDrive 30e M Sport 5dr Auto [Pro Pack]
"Comfort Pack, M Sport Brakes."BMW X3 xDrive M50 5dr Auto
"Tech Pack-360 Cams-HUD-393 Hp!"2024 (74) BMW X5 xDrive50e M Sport 5dr Auto
"£500 Deposit Contribution"BMW X5 xDrive40d MHT M Sport 5dr Auto [Pro Pack]
"Brand New Physical Stock!"BMW 4 SERIES 420i M Sport 5dr Step Auto
"Harman Kardon, M Sport Pro"Get in Touch
Simply fill in your details below and we’ll get back to you within 24 hours. Alternatively, you can call your local branch by telephone.









































































![2023 (23) BMW 1 SERIES 118i [136] M Sport 5dr [Live Cockpit Professional]](/VehicleLibrary/289090-m3D55AmXEUuhEUL6oejuAg.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)
![2023 (23) BMW 1 SERIES 118i [136] M Sport 5dr [Live Cockpit Professional]](/VehicleLibrary/289090-4Tt0bwZqFkeJarE1qVxXvA.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)




![2025 (75) BMW X3 xDrive 30e M Sport 5dr Auto [Pro Pack]](/VehicleLibrary/746141-xsj9pUBSbkeR97teeOfELQ.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)
![2025 (75) BMW X3 xDrive 30e M Sport 5dr Auto [Pro Pack]](/VehicleLibrary/746141-WWOuiTaE2QwLuudvQlHQ.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)




![BMW X5 xDrive40d MHT M Sport 5dr Auto [Pro Pack]](/VehicleLibrary/321017-k1e9BVszEOVwKMhF4cveQ.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)
![BMW X5 xDrive40d MHT M Sport 5dr Auto [Pro Pack]](/VehicleLibrary/321017-qZcRpS1lJ02xH9HyEUpXQ.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)

