
2020 (70) LAND ROVER DISCOVERY SPORT 2.0 D200 SE 5dr Auto
"HSW, Pan Roof, 20" Alloys,Priv"
6 People Have shortlisted this car
Luxurious Discovery Sport with full service history and 1 owner. 201BHP performance, panoramic roof, heated seats and steering wheel, plus 3D camera and ACC for a refined, confident drive. Protected by 1 Year LR Warranty
We can bring any vehicle to your nearest Lloyd location
With locations across the North of England and South of Scotland, we can bring the vehicle of your choice to your nearest Lloyd dealership. Alternatively, we can prepare a personalised video tour of the vehicle, providing detailed information for any of your queries.Please contact the location where the vehicle is currently, and they will arrange this for you.

Key Features
Built-In Sat Nav
5 Star Safety Rating
Climate Control
Panoramic Roof
1 Previous Owner
Full Service History
Heated Seats
Overview
7 Seats, Fog Lights, Spare W
Features
Our Discovery Sport includes the following features
- Front fog lights
- Heated steering wheel
Specification
- Blind spot assist
- Front and rear parking aid
- Lane keep assist
- PAS
- Rear traffic monitor
- Rear view camera
- Traffic sign recognition with adaptive speed limiter
- Wade Sensing
- 0 to 62 mph (secs) : 8.9
- Top Speed : 117
- Engine Power - BHP : 204
- Engine Torque - NM : 430
- WLTP - CO2 (g/km) - Comb : 183
- WLTP - CO2 (g/km) - Comb - TEH : 191
- WLTP - CO2 (g/km) - Comb - TEL : 183
- WLTP - MPG - Comb : 40.6
- WLTP - MPG - Comb - TEL : 40.6
- WLTP - MPG - Comb - TEH : 38.9
- WLTP - MPG - Comb - TEL : 7
- 3D Surround Camera with 360 View, 180 Rear View, Front Traffic Detection, Forward Vehicle Guidance, Tow Hitch Assist and clear sight Ground View
- Android Auto
- Apple CarPlay
- InControl remote premium
- Powered tailgate/boot lid
- Bluetooth connectivity including audio streaming
- Digital Audio Broadcast radio-DAB
- Steering wheel mounted audio controls
- 3 point seatbelts on all seats
- ABS
- Brake hold function
- Collision mitigation braking system
- Cornering brake control (CBC)
- Driver/Front Passenger airbags
- Drivers knee airbag
- Electronic brake force distribution
- Electronic parking brake
- Emergency brake assist
- ESP + traction control
- Hill descent control
- Hill launch assist
- Pedestrian airbag system
- Side and curtain airbags for front and 2nd row seats
- Tyre pressure monitoring system
- Battery Back Up System (BBUS) with tilt sensor
- Intrusion sensor
- Locking wheel nuts
- All terrain progress control
- Coil suspension system
- Terrain Response 2
- Automatic headlight levelling
- Automatic headlights
- Electric front/rear windows
- Fixed panoramic sunroof with powered sunblind
- Rain sensing windscreen wipers
- Rear fog lights
- Rear wiper
- Alloys? : Yes
- Door mirror memory
- Power fold, auto-dimming, heated door mirrors with approach lights
- Centre console with armrest
- Front passenger isofix child seat attachment
- Rear headrests
- Third row dual adjustable individual seats
- Tilt/reach adjustable steering wheel
- Rear seat ISOFIX
- No. of Seats : 7
- Diesel particulate filter
- Trailer stability control
- Minimum Kerbweight : 1953
- Gross Vehicle Weight : 2750
- Fuel Tank Capacity (Litres) : 65
- Max. Towing Weight - Braked : 2200
- Max. Towing Weight - Unbraked : 750
- Luggage Capacity (Seats Up) : 840
- Tyre Size Spare : Tyre Repair Kit
- Transmission : Auto
- Wheel Style : 5 Split Spoke Style 5076
- Insurance Group 1 - 50 Effective January 07 : 32E
- Service Interval Mileage : 21000
- NCAP Overall Rating - Effective February 09 : 5
- Badge Engine CC : 2.0
- RDE Certification Level : Rde 2
- Online pack - Discovery sport
- Length : 4597
- Width (including mirrors) : 2173
- Height : 1727
Land Rover Approved
12-Month Warranty
12-month unlimited mileage Land Rover Approved warranty
12-Month MOT & MOT Test Cover
12-month MOT with insurance worth up-to £700
12-Month Road Side Assistance
12-months UK and European roadside assistance and recovery
Detailed Vehicle Health Check
165 Muti-point check by our Land Rover trained technicians
Vehicle History Checks
Independent mileage and history checks including HPI
Land Rover Experience Day
Complimentary half-day Land Rover Experience
Calculate Your Finance
Personal Contract Purchase (PCP) is a great option if want more car for your money - the cost of the vehicle you are buying is spread over an agreed length of time at a fixed interest rate with a fixed monthly payment and the future value of your vehicle will be guaranteed. At the end of the term, you will have three options.
- Hand back the vehicle with no further payments
- Part Exchange for a new one and start the process again
- Settle the outstanding balance and keep the vehicle
PCP Representative Example
This finance quote is subject to terms and conditions
Interested in this finance quote? Get in touch with your local Lloyd branch to discuss the quote.
Contact Us About FinanceCalculate Your Finance
Hire Purchase (HP) is perfect if you want simplicity - the cost of the vehicle you are buying is spread over an agreed length of time at a fixed interest rate with a fixed monthly payment. After the final payment, you own the vehicle.
HP Representative Example
This finance quote is subject to terms and conditions
Interested in this finance quote? Get in touch with your local Lloyd branch to discuss the quote.
Contact Us About FinanceFinance Terms and Conditions
Why Buy a Used Vehicle from Lloyd?
The Full Package
We can offer you the full range of automotive services tailored to meet the requirements of your needs.
We’ve got History
With 45 years experience as a family owned independent business we pride ourselves on unique standards of service and attention detail.
Unique Showroom Experience
The experience of visiting our showrooms is second to none providing a relaxing environment for you to browse, configure and drive right out of the showroom.
Lloyd Recommends
2025 (75) LAND ROVER DISCOVERY SPORT 2.0 D200 Landmark 5dr Auto [5 Seat]
"Pan Roof, Priv Glass, ACC"2 People shortlisted
View This Car2024 (74) LAND ROVER RANGE ROVER SPORT 3.0 P460e Autobiography 5dr Auto
"Black Pack, Panoramic Sunroof"1 Person shortlisted
View This CarLAND ROVER DEFENDER 3.0 D350 X-Dynamic HSE 90 3dr Auto
"Discount Includes £1000 FDA"6 People shortlisted
View This CarLAND ROVER RANGE ROVER EVOQUE 1.5 P270e Edition 5dr Auto
"In Stock, Pan Roof, Black Pack"4 People shortlisted
View This Car2023 (23) LAND ROVER RANGE ROVER SPORT 3.0 D350 Autobiography 5dr Auto
"Elec Towbar, 23" Black Pack"2 People shortlisted
View This CarLAND ROVER RANGE ROVER SPORT 3.0 D300 Dynamic SE 5dr Auto
"23'' WHEELS, SLIDING ROOF"2025 (75) LAND ROVER DISCOVERY SPORT 2.0 D200 Landmark 5dr Auto [5 Seat]
"Fixed Pan Roof, Privacy Glass,"6 People shortlisted
View This Car2025 (75) LAND ROVER DEFENDER 3.0 D250 X-Dynamic SE 110 5dr Auto
"Black Pack, Panoramic Roof"13 People shortlisted
View This Car2024 (74) LAND ROVER RANGE ROVER EVOQUE 2.0 D165 S 5dr Auto
"Rear Cam, Heatd Steer, Carplay"5 People shortlisted
View This CarLAND ROVER RANGE ROVER 3.0 D350 Autobiography 4dr Auto
"23" Gloss Black Alloys"1 Person shortlisted
View This CarGet in Touch
Simply fill in your details below and we’ll get back to you within 24 hours. Alternatively, you can call your local branch by telephone.














































![2025 (75) LAND ROVER DISCOVERY SPORT 2.0 D200 Landmark 5dr Auto [5 Seat]](/VehicleLibrary/292096-pCBn6nsEJkK8krq6UKlQQ.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)
![2025 (75) LAND ROVER DISCOVERY SPORT 2.0 D200 Landmark 5dr Auto [5 Seat]](/VehicleLibrary/292096-589fqIoNBEygb9M1pf3Q3Q.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)










![2025 (75) LAND ROVER DISCOVERY SPORT 2.0 D200 Landmark 5dr Auto [5 Seat]](/VehicleLibrary/30296-MG29p4UF6UezBK0FUloIeA.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)
![2025 (75) LAND ROVER DISCOVERY SPORT 2.0 D200 Landmark 5dr Auto [5 Seat]](/VehicleLibrary/30296-7PrgSucBBkWeJvqJLu3CyA.jpg?height=315&heightratio=0.75&mode=crop&upscale=true&width=420)





